![]() ![]() ![]() ![]() Just jumped off a conference call and called this number- thanks for the tip! If the website is ever down or buggy (never happen, right?), the 80 automated RR status menu now reports tier status and expiration date. I didn't want to hang that person out to dry if it didn't go the way he said due to a last minute it glitch, or posting issues on 2/28 flights, so that's why I held off on posting more specifics on that thread. Since Brian indicated long ago that they wouldn't give him an answer prior to 3/1, a couple weeks back I talked to a Southwest HDQ RR representative who took several days and went up several layers of the food chain, to both IT and the RR bosses, to call me back with the answer that it was a 1 time sweep Mar 1-Feb 28th, not a rolling 1 year, or based on 2010 calendar year. A family member had to fly almost 20 extra $19 segments and earned the 50th yesterday morning. It's also why I spent $300+ and flew 10 extra flights in the last few weeks. That's in line with what I had been indicating would happen on another thread. A list were pretty clear though.įorlan-Unfortunately from the data I've seen and what you posted, the a-list preferred sweep was done 3/1/10-2/28/11. The fact that they are fixing this is good news: renewals CP earned on the old site weren't exactly clear. Phase Two will add another 1 million square feet.Will the A Plus Preferred sweep qualification be for through or for through ?īrian's post mentions that members are seeing a 12/31/11 but not a 12/31/12 expiration date as many had expected. Phase One of The Wharf, with 2 million square feet of development, opened in 2017. Hoffman-Madison-Waterfront, the joint venture of Hoffman & Associates and Madison Marquette, which are codeveloping The Wharf, began work on Phase Two earlier this year. The buildings will join another unusual one underway: a 12-story, curved glass-walled condo building called Amaris, designed by Rafael Viñoly. That leaves about 200,000 square feet still available. Williams & Connolly signed a 15-year lease for 300,000 square feet in the two buildings - relocating from its Metro Center location, where it has been since 1992 - when the buildings are complete. The buildings also include penthouse spaces with Capitol and waterfront views, and private terraces on some floors, as well as 30,000 square feet of retail space planned for waterfront restaurants. The buildings are designed by SHoP Architects and WDG Architects, and will be connected by “The Oculus,” formed by a glass bridge between the towers’ second levels, creating a porte-cochere entrance for the two buildings. law firm Williams & Connolly LLP moves into its new headquarters at The Wharf in 2022, it will be anchoring a pair of stunning buildings on Maine Avenue Southwest.ĭeveloper Hoffman-Madison Waterfront has released renderings of its trophy office buildings at 670 and 680 Maine Ave. Business & Finance Click to expand menu. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |